Project Info
JHIMPIR POWER
Description
Client: Jhimpir Power Limited
Location: Jhimpir, Sindh – Pakistan
Capacity: 49.7 MW Wind Power Plant
Services: End of Warranty Inspection for EBoP
Duration: 2020 ~ Contd.
Contracted by Jhimpir Power limited to provide the End of Warranty Inspection for EBoP with the following objectives;
To audit the health of the balance of plant equipment prior to the end of the warranty.
To document the condition of the equipment in terms of the influences of any sub-standard maintenance (latency), as well as any sub-standard material quality (serial defects)
Identify any latent issues resulting in sub-optimal power generation over during the under-warranty operations
Establish baseline conditions of the farm, for use in determining the root cause and propagation of problems/downtimes that may be experienced in future operations.
To empower the Client in preparing and defending warranty claims as per the applicable EPC/O&M contract(s)